Chapter 869 Liquidated Damages
Chapter 869 Liquidated Damages
Chapter 869 Liquidated damages
Mavis didn't bother to pay attention to him, and lay down on the other bed, with her back to him.
It was a sleepless night for Mavis, but Anthony simply didn't ask any more questions, fell asleep
peacefully, and didn't intend to disturb her.
He was always changeable, and Mavis couldn't figure out what he meant, and didn't bother to guess.
It was at dawn when Mavis fell asleep.
She had developed a habit that she will wake up naturally at half past seven.
She quietly turned over and took a sneak peek.
On another bed behind her, Anthony was still fast asleep, breathing steadily.
Mavis took her things lightly and left.
Anthony's fancy luxury car was parked downstairs, and there were several empty parking spaces
around. After all, no one would be stupid enough to be close to the Rolls-Royce.
Looking at his car, Mavis took a taxi to the Callahan Group.
When she came to the company, she stood blankly in front of the building, a little absent-minded.
In the past, she longed to stay here to work and stay with him, but now, she didn't want to.
After taking a deep breath, Mavis adjusted her emotions and walked into the company.
When she came to her table, she turned on her mobile phone.
There were countless messages.
Mostly from Anthony.
Some of them asked her where she was, some asked her why she left the job, and some of them were
threatening words.
She selected the messages and deleted them all.
She put the phone aside, turned on the computer, and an email popped out immediately.
Anthony rejected her resignation.
What if he disagreed?
Unconvinced, Mavis resubmitted a resignation application and began to pack up the documents.
Few minutes later, Anthony rushed over, snatched the packing box from her hand, and said coldly, "The
contract you signed with the company has not yet expired. If you leave now, you must pay ten times the
liquidated damages."
Ten times liquidated damages?
Mavis was stunned.
"Anthony, you have no right to do that."
Anthony sneered and grabbed her wrist again, "The company is mine, and I have the final say on the
contract. If you are not satisfied, you can consider filing a lawsuit with the legal department."
His overbearing behavior was shown again, and Mavis couldn't say anything to refute him.
Mavis stared at him, seemingly silently protesting.
"If you can't pay liquidated damages, you can only resign after the deadline."
It seemed like a game of cat and mouse was about to begin.
They looked at each other, and finally, Mavis was defeated.
She was not his opponent yet, and even her work was tightly controlled by him.
Looking at her angry appearance, Anthony was in a good mood, "If you feel that you are too tired and
in a bad state recently, I can give you a leave of absence."
Mavis said with a cold face, "Please get out of my office. I have to work."
Her eyes fell on the screen, ignoring Anthony.
Seeing this, Anthony smiled and turned to leave.
The door of the office was closed, and Mavis was in a state of confusion, with all the thoughts flooding
her mind.
It was more like there were two little voices in her head, fighting at any time, disturbing her mind.
Inside the president's office.
Zack walked in with a stack of documents, and saw Anthony with a rare smile on his face.
It seemed that the date last night was very good, right?
"Mr. Callahan, here is the documents you need to sign. Please have a look."
He turned a document to the last page, and said, " There is a new movement in Mofleunia. Our
hostages were transferred by Danny Hobbes."
They used various forces to find out that Danny had quietly transferred the hostages.
"OK."
Anthony responded lightly, which was expected.
Danny would not release those hostages easily. Otherwise he would have no bargaining chips in his
hand.
As Anthony kept signing, Zack spoke again, "There's one more thing."
"After investigation, it was found that among those hostages, not only our people, but also Miss Lloyd's
subordinate, who was her former assistant, acts as our collaborator this time to make the next plan."
It was about Lyra. Anthony held the pen for a second, and asked, "What's going on at Lloyd's Corp?" Please check at N/ôvel(D)rama.Org.
He understood Lyra's temperament. If her person was arrested, she would definitely rescue personally.
Zack shook his head, " Lloyd's Corp hasn't made any moves yet. What's your plan?"
Closing the last document, Anthony got up and walked to the French windows, lit a cigarette, and fell
into deep thought.
After a long time, he ordered, "Continue to pay attention to Danny Hobbes' movement first, and act
immediately if there is something wrong. Also, be ready to contact the Lloyd's Corp for cooperation at
any time."
The company opened in Mofleunia this time was a cooperation between Callahan Group and Lloyd's
Corp, so this was why Anthony was so concerned about this branch.
And it was also about Lyra's interests, so there should be no mistakes.
the Lloyd's Corp.
After signing the last page, Lyra handed the document to Kellie, "Check the news from Mofleunia, and
check Lisa's location."
"Okay, Ms Lloyd."
Lisa was the person she sent to Mofleunia and Anthony's company to discuss cooperation this time.
She was very experienced in doing things, which was why Lyra was so relieved to let her take charge
of this project alone.
The Lloyd's Corp personnel who was dispatched to other countries to discuss cooperation will have a
chip implanted in the cortex of the wrist, which can report their location at all times to prevent danger.
After a while, Kellie walked in with a device specially designed to record the company's expatriates,
and pointed to the red dot on it.
"Ms Lloyd, Lisa's current sign is normal, and the location is shown at the intersection of Mofleunia,
European Swye, and Hegrana, which is known as the most dangerous triangle in the world."
Lyra frowned.
No wonder something happened to Anthony.
But Lisa was still in their hands. She must be responsible for Lisa's personal safety. This was her
promise to all the Lloyd's Corp employees, and she must not break her promise.
"Continue to observe. If the position is different, let me know at any time."
After saying this, Lyra got up and left.
This time, she must go to Mofleunia herself and bring back her people, and no one had the right to
harm her people.
Driving back to Lyre Spiti, Spencer was having lessons with the tutor and Molly went to kindergarten as
usual.
Lyra came back so early. The bodyguard at the door stepped forward and asked, "Madam, do you want
to arrange something?"
The couple had a lot of daily affairs, and it was rare for her to come back so early.
"Go get Molly back. And let Spencer's tutor leave first."
"Okay, I'll do it now."
After the bodyguard left, Lyra entered the villa and went upstairs.
After a while, Spencer followed.
Seeing Lyra packing up her things, he couldn't help but ask, "Mom, are you going on a business trip?"